A quick little blog about how it all went down today. Mornington Peninsular. Vic. NBN ran the fibre and pits in Dec 2023 / Jan 2024, I got very excited. I subscribed as soon as it became live in mid July with Superloop, online application, had an NBN appointment within 20 minutes. 😳 Appointment to change over from FTTN to fibre. From 38 mbps down / 8 mbps up copper to: Appointment time between 8am and 12am, arrived at ~ 9:40, from where I know not. First job, fibre to the box with splitters, fortunately only the next box up from me had them, about 150 mtrs. I fortunately had a pit right in front of my house. (right side of the street!) where my copper Telstra conduit entered. Pit with 9 splitters pre configured. Plug and play. Pulled in easily with a snake, 20 minutes. Interestingly all their fibre cables are pre-terminated at different lengths, grab the length thats needed. Plug and play. (That also goes for the internal fibre, it was a bit long, so...